ON-GOING PROJECTS:
Establishment of Tourism Facilities and infrastructure showcasing of Sikh Culture, Chamkaur Sahib.
Construction of Link Taxi, Helicopter parking and other Miscellaneous works at Jammu Airport.
Construction of NH 21A (NEW NH-105) four-lane Pinjore bye-pass starting from km 54.533 of NH-22 and terminating at Km 3.88 of NH-21A in the State of Haryana on EPC Mode.
Widening and strengthening of existing single/2 lane to 2 lane with earthen shoulder configuration from Fata to Sitapur on NH-109 (New NH-107) in the State of Uttarakhand under EPC mode.
Holistic plan for revitalization of sector 17, Chandigarh and development of bicycle and pedestrian track connecting sector 17 to capital complex of Jan Marg.
Construction of ROB and its approaches parallel to existing ROB on NH-65 (New NH-152) at Ambala in the State of Haryana on EPC mode.
Establishment of Civil Enclave at Adampur Airport (Punjab). SH: Construction of Apron, Taxi Track and Associated Works.
Establishment of Tourism Facilities and Infrastructure Showcasing of Sikh culture- Lot 1- Interpretation center at Chamkaur Sahib in State of Punjab.